Welcome to Biosafe, Crowthorne Groups Emergency Recovery scheme for customers with a containment level 3/Hazard Group 3 facility.

CL3/HG3 Emergency Fumigation Plan

The range of options are:

Fumigation service

A full lab service available with a membership option which gives access to priority scheduling and 24/7 telephone support.

Efficacy Study

Validation of a fumigation plan is needed for ACDP compliance, this option includes:

  • The provision of an emergency fumigation procedure
  • Confirmation of the fumigation procedure efficacy
  • Identify “dead” spots within the laboratory and recommend remedial actions
  • Carry out a simulated emergency fumigation using chemical and biological indicators as appropriate to demonstrate efficacy
  • Provision of an efficacy study report

 

Sealability integrity test -

  • An integrity test for a lab which will confirm ACDP compliance which includes:
  • Visual inspection of the fabric, finishes and structure
  • Fabric integrity leak testing using a smoke pencil or similar ACDP approved methodology
  • Differential pressure measurement
  • Undertake a simulated fumigation cycle to shut down and re start the laboratory using the clients existing fumigation protocol
  • Confirm the correct operation and control of dampers, fumigation sockets

Optional Extras

  • HEPA filter testing (extract and/or supply)
  • Safety cabinet service and validation to include KI Discus testing on a six-monthly basis as recommended in the ACDP guidance
  • Magnehelic gauge zero and verification
  • Pressure decay test
 

*Additional Services

Retests following leak repair of failures, spare parts.

Replacement safety cabinet, pressure decay test